Project Duration:
04 September 2023 – 07 September 2023
Geographical Location:
Washuk
Donor:
IOM
Project Output:
- Provision of repair toolkit, bamboos, plastic sheets, ropes, pegs and poles, NFIs and hygiene kits to 300 flood affected households in district Washuk, tehsil washuk and besima.