Emergency Shelter and NFIs Distribution

Project Duration:

04 September 2023 – 07 September 2023

Geographical Location:

Washuk

Donor:

IOM

Project Output:

  • Provision of repair toolkit, bamboos, plastic sheets, ropes, pegs and poles, NFIs and hygiene kits to 300 flood affected households in district Washuk, tehsil washuk and besima.
Facebook
Twitter
LinkedIn
Pinterest