Emergency Shelter and NFIs Distribution
Project Duration: 04 September 2023 – 07 September 2023 Geographical Location: Washuk Donor: IOM Project Output: Provision of repair toolkit, bamboos, plastic sheets, ropes, pegs and poles, NFIs and hygiene kits to 300 flood affected households in district Washuk, tehsil washuk and besima.
